Skip to main content
GET
Get project export status
Back to the Project API overview Use this endpoint to get the status of a project export. Poll it with the operationId that Start project export returns. The status values include queued, processing, packaging, completed, and failed. The progressPercent field estimates progress from 0 to 100. The request needs the project_io.read scope. When the export is completed, the response includes the manifest, the lockfile, and a short-lived downloadUrl. Download the archive before expiresAt. The lockfile holds content hashes that you can use to verify the archive. A successful request does not mean the export succeeded. Check data.status and data.errors.

Authorizations

x-api-key
string
header
required

Project-bound Platform Key supplied in the x-api-key header. The key must include the operation's required scope: project_io.read for export operations or project_io.write for import operations. A pipeline that promotes changes normally requires both scopes.

Path Parameters

projectId
string
required

Project identifier. The project must belong to the authenticated tenant.

Minimum string length: 1
exportId
string
required

Identifier returned when the export operation is created.

Minimum string length: 1

Response

Current export operation status and result metadata.

success
boolean
required

Indicates that the status request was read successfully. The operation itself may still be running or may have failed; inspect data.status and data.errors.

data
object
required

Export operation record and, after completion, the manifest, lockfile, and archive download URL.